years
load and have been factory where made times now and way. have always Knauf’s plasterboard and when was quite keen to reminisce about the good ole days.
when picked spoke to were very keen which was life saver as with any building the run over budget and ours
worked out needed what the specification needed to be and the team at came back me with exactly to when they going deliver. was very at and before had and was typically
for bit of miscommunication on my and we rescheduled delivery and it worked out perfect.
the sure garage property would fit in and so shut door and went home. The following day in front and saw huge main road and thought stop and there is no way hell he going be able to turn around 10 minutes later started to see traffic backing the and knew what was
reversing back very between he looked cool soon truck.
taking of quite to see it outside our and it looked
first pallet drive and going the second or third pallet. So and pallets into garage
day
first load own, but was the foam on and so to lift but after 36 odd ago.
with cup of tea and biscuit his felt bad for taking but he is quite were and
about hours in total with regular and think that was mainly for but have also to mention that was beautiful and it was and resided to woolly hat to the sweat and to shade my somewhat patchy head from
was 10 boards where my good lady helped me load them upstairs ready ceilings. Jane was weight up saw how full was. Somewhere behind that stack of plasterboard is my KTM motorbike… looks like its going to be there for a while.
plasterboard to complete the project helped K