to for supplying quite keen start getting the lids tacked for the insulation and start getting walls insulated
we could tack the lounge wanted to add some extra noggins in belt and brace the ceiling to sure that was also light rose mounts is nothing than trying light straight into plasterboard.
passed and road come the following day tack ceiling. when organised it Jane too heavy for me help.
start don’t wasting time so thought and if could ceiling home and wait for Jezza next day.
picked and got it onto my was little soon got grips and made step up on to crate and elbow to place with my first board and was by
started use to do like this long and my method was quickly and ceiling was coming along. was firing enough i hold the board up drop and fire
the walls and it do other than the side
boy tired when home me that had done but did have of
with plasterboard.