build to start getting insulated seeing my walls storage behind them decided done.
and was
mention that about 1000 degrees up terrible but pushed on slowly but surely. The well that was the theory.
managed to start hang measuring but it seemed that every other was getting splinters and they these could not be dealing with this with every time followed by bang as another part of my body would come contact with something else loft space.
and had to resort to knife
in as on
but an update.